Testimonials

Satisfied Clients

YORK CIVIL
Luke Hinton Concreting was contracted by York Civil to perform the concrete formwork and steel content of the Emmaus Collage overpass project in Rockhampton.

During this project Luke and his team conducted themselves in a professional, safe manner at all times. The project was completed on time, with a good quality of workmanship.

We look forward to working with Luke Hinton Concreting in the future and hope to grow our relationship further. Should you like any further detail regarding their involvement in this project please don’t hesitate to contact myself or the QLD office.

Regards
Joel Herbert
Project Site Supervisor
York Civil Pty Ltd


DEPARTMENT OF TRANSPORT AND MAIN ROADS
I have worked with Luke Hinton during the construction of the Yaamba Road Pedestrian Overpass in North Rockhampton and I have observed the type of work consisted of fabrication of various types of structures for example: columns, cast in place stair walls, driveways, footpaths, kerb and channel and lift wells. Luke and his crew assembled all of the steel work for the reinforcing for this project as well as the formwork and shutters.

I have found Luke a pleasant person to work with and he is more than capable of performing the work given to him in a professional manner. The quality of his work is of a high standard and I would have no reservations in recommending him to do any concreting of any nature in the future.

Regards
Greg Covington
Roadworks Inspector | Rockhampton Office
Assets and Operations | Department of Transport & Main Roads


O'DONNELL GRIFFEN - Electrical & Communications Engineering
Luke Hinton Concreting has worked as a principle subcontractor for O’Donnell Griffin Queensland for the past 12 months on the AM01 contract, a major multi service and complex infrastructure project at Kestrel Mine Extension (KME), a RTCA underground mine north of Emerald in Central Queensland.

Luke and his crew have carried out large and complex concrete pours on the KME site sometimes under critical time constraints, they have performed all their allotted tasks well and completed the work to expectation and to the quality standards and specifications required under the AM01 contract.

Luke and his crew have maintained a high level of safety while working on the KME Brown and Greenfield sites with no reportable incidents to date; they are familiar with Take 5 and Hazard reporting and attended regular Tool Box and Prestart meetings and actively participate in them.

I can personally vouch for Luke and his crew, and can be contacted as a reference.

Yours Sincerely,
Peter Kearney
O’Donnell Griffin
AM01 Project Director - Kestrel Mine Extension


ATCO STRUCTURES & LOGISTICS - GLNG
This is to confirm that Luke Hinton Concreting Pty Ltd has been conducting various concrete works on the ATCO GLNG site, Curtis Island since September 2011. They have been involved in formwork, steel fixing, concrete placing and finishing on all facets of camp construction.

I have found Luke Hinton Concreting to conduct themselves in a very professional and reliable manner with a strong emphasis and track record in safety performance.

Luke Hinton Concreting takes pride in completing projects in a timely fashion with a very high standard of workmanship. Their workforce has been professional and approachable with a positive attitude when interacting with other contractors on site.

Luke Hinton Concreting has displayed an ability to be flexible in the face of challenging working conditions and shifting priorities as needed on a day to day basis.

I have no reservation in recommending Luke Hinton Concreting for future concreting work.

Yours Sincerely,
Tom Parojus
ATCO CLNG Project Manager
ATCO STRUCTURES & LOGISTICS PTY LTD


AUSENCO MINERALS & METALS C/- KESTREL MINE EXTENSION
Luke Hinton Concreting have undertaken various works on the Kestrel Mine Extension Project during my time here as Civils Supervisor.

I have found Luke to be a strong performer who is able to assemble efficient teams who work within the guidelines of the project achieving good results.

Luke’s teams are all experienced tradesmen who can work with minimal supervision and have a very strong safety culture which is not easy to achieve and often lacking in the concrete industry.

One of the Luke’s best attributes would be his flexibility and ability to adjust his operation to work in with multiple work fronts and cater for the clients different needs.

I look forward to working with Luke and his team as this project progresses and wish him well in any other future endeavours.

Regards
Lenny Wright
Civils Supervisor
Kestrel Mine Extension Project


HUTCHINSON BUILDERS
I confirm that I have dealt with Luke Hinton Concreting during the construction of The Rec Club and 17 luxury two storey apartments at the Hutchinson Builders built Seaspray Resort and Spa at Zilzie, Emu Park QLD.

During all phases of construction I found Luke and his staff conducted themselves in a very safe and professional manner.

The quality of work delivered was exceptional.

I can confidently recommend Luke Hinton Concreting as a solid and reliable business, who is committed to achieving the highest standards of finishes.

Should you require any further information, please don't hesitate to contact me.

Yours Faithfully
Cody Harris
Site Foreman
Hutchinson Builders Pty Ltd